:::
Apply for process
APPLICATION OF INSPECTION AND REGISTRATIONFOR DRINK WATER

Application of Inspection and Registration for Drikn Water

Question of appliction:
1. One inspection once a year resident of each household in Pingtung Country.
2. Drinking water is the groundwater in area withwout tap water.
3. The following conditions will not be accepted:

  (a) Groundwater and tap water has been treeted.
(b) Dinking water and groundwater are in public / private locations.

Applying process
I.D. Card and seal needed ; apply to Air / Water Quality Protection Section ; application should fill in the information of contact tel. no. and add; sample will be taken in due course; monthly 50cases can be accepted ; if more than that , it will be accepted and handle in next month.
 
INSPECTION PROCESS OF EVALUATING INFLUENCE TO ENVIRONMENT

Inspection Process of Evaluation influence to Enviroment

1. The company submits the interpretation of environment influence to the bureau. If it is unacceptable, the campany shall summit a new substitute project or being rejected.

2. The relevant institution hands it over to relevant section.

3. The environment protection institute holds a committee to inspect the environmental evaluation.They spend 50 days to inspect completely for a normal case and extend 50 days for a special case. If the environmental evaluation is acceptable, it will be announced and opened. If the environment evaluation still has significant influence, it shall be evaluated.

4. Continuing evaluation

  (a) The company has to send interpretations to relevant institution or public(duration has to be at least 30 days).

(b) The company has to hold a meeting to open interpretations.

5. The environment protection institute identifies the range of evaluation.

6. The company drafts of evaluation influence to environment.

7. The relevant institution sites visit and arrange a hearting which is competing within 30 days and also recording eithin 30 days).

8. The environment protection institute has a committee to inspect the environmental evaluation.They spend 60 days to inspect completely for normal case and extend 60 days for a special case. If the environmental evaluation is acceptable, the result of inspection will be announced and published in newspapers. If the environment evaluation is unaccetable, the campany shall summit a new substitute project or being rejected.
 
REPORTING OPERATION PROCESS FOR AIR POLLUTION FEE FOR CONSTRUCTION ENGINEERING

Reporting Operation Process for Air Pollution Fee for Construction Engineering

1. Fill in the application with seals of the company.

2. Submit relevant documents including contract for approval.For example:if the fee is more than NT 5000 , pollution prevetion plan will have to be submitted.

3. Issue payment statement.
 
TREATMENT STANDARD OPERATION PROCESS FOR PUBLIC POLLTION

Treatment Standard Operation Process for Public Pollution

1. Accept the report

2. Understand the cause as pollution category, pollutant and sympath to the appicant.

3. Site investigation bans the company. If it is improved immediately , the case can be closed. Somethings like tracking the pollutant , interviewing the applicant and interviewing the residents in the neighborhood are subject to confirmation by the institute or bureau.

4. If it isn’t be improved immediately , the regulator will be punished.

5. View the policy of poblic pollution.
6. View the policy of poblic pollution.
7. Impove the pollutant.
8. Explain the treatment process to the applicant.
9. Close the case.
10. Fill the treatment records.

11. Somethings like tracking the pollutant , interviewing the applicant and interviewing the residents in the neighborhood are subject to confirmation by the institute or bureau.